- Flat land with its own boat launching docks
- soil test and septic plan already done
- The land is served by CTAL fiber optic (more than 100 optical feet included)
- The implementation project is done and according to the surveyor, it is possible to build a 32 x 50 cottage without moving the electric pole. Possibility to have bigger in
moving the power pole.
- Build the cottage ideally on a slab as the water table is quite high.
- Electricity already in place: 100 amp panel and sockets already installed in the shed and a 30amp trailer socket.